19 SET, WS19 6 PIN FEMALE TO 6 PIN FEMALE LONG LEAD, CONNECTOR 6 PIN 50J

Stock Code: SHOP14
Availability: 1 in stock
€57.04

WS19 6 PIN FEMALE TO 6 PIN FEMALE LONG LEAD, CONNECTOR 6 PIN 50J.  New unissued with storage marks on the yellow fabric cabling cover.

Product tags